Digital twin value chain

BIM as a byproduct of the energy calculation

Digitalising the existing building stock is the largest single task in the energy transition, and modeling is what stalls it. Lamit reverses the order: the model is built because the physics calculation needs it, and the BIM model is what the owner receives.

Existing stock · Verified models · Network-ready

The bottleneck is the model, not the will

Every city knows which buildings should be renovated first. What is missing is an accurate, comparable model of those buildings — a modeling project with no immediate payer. When the model is a byproduct of a calculation someone already needs, that barrier disappears.

01

Existing data in

Drawings, laser scans, asset registers and measured consumption enter the process as the starting point, not as the deliverable.

02

Energy calculation

The building is calculated for all 8,760 hours. Producing that calculation requires a complete, consistent building model.

03

BIM as a byproduct

The model built for the calculation is the BIM model the owner needs — geometry, build-ups and quantities, already verified by physics.

04

Node in the network

The verified model joins A+Nodes as a calculation node, so the building contributes real behaviour to the district model.

What the chain leaves behind

An accurate BIM model

Not a visualisation: a model whose areas, volumes and material masses have survived an energy balance check.

A verified energy model

The same model answers renovation, heating system and grant questions without a new survey each time.

Documented building stock

Cities gain a machine-readable description of existing buildings — the base every renovation programme needs.

District-ready nodes

Each building feeds the network model with its real hourly profile instead of an annual consumption figure.

Definitions of BIM, IFC and digital twin: BIM glossary.

Start from the buildings you already own

A portfolio, a block or a single property — the chain is the same. We will tell you what the first calculation would deliver beyond the calculation itself.